Project 1:

Niagara Bottling, Arizona Facility

Description:

New water bottling facility. Install complete utility system with two Sidel production lines.

Datacom and IT networks to new office building.

Duration: 5 months

Cost: $1.2 million

Project 2:

Target Distribution Center, Virginia

Description:

Complete installation of Hytrol engineered conveyor system.

Duration: 3 months

Cost: $500,000.00

Project 3:

Pepsi Bottling, Columbia, South
Carolina Facility

Description:

Installation of complete utility plant, Sidel blow molder, two Sidel labelers, Airveyor, and SCADA system.

Duration: 2 months

Cost: $350,000.00